Week Three
Click on any photograph to view the album in carousel format.
Yellow paint marks the position of the floor joists.
Conduit running the length of the wall.
Jim, to the left of the entrance to the parish room, cutting out a hole to site one of several sockets.
South Aisle – foundations four and five ready for their walls.
Conduit running down the length of wall one towards the pulpit.
South Aisle
An overview from of the Nave and South Aisle from the font at the end of Week Three.
Mini-digger in a church. It’s remains surreal.
Socket positioned to the left of the entrance to the Parish Room (and cup of tea!)
Some of the brickwork needs cutting out to fit the conduit.
The electrical work has started. The first of the conduits in place.
South Aisle
South Aisle walls four and five.
Hard to believe but there is still more rubble to remove. At least it’s only a short trip to the door.
Wire for the new lighting on the North Aisle wall.