The final pieces of the insulation board going into place in the Nave

Towards the Bell Tower

Random Stuff

Time capsule in situ between floor joists.

Joists around the font

South Aisle

Timecapsule in situ

View from the Chancel

Concrete Pad

Concrete Pad

Rockwool & South Aisle

Ready for the underfloor heating

South Aisle

Concrete Pad

The South Aisle

Rockwool waiting to make its entrance!

David and Timecapsule ready for its burial.

…some of it has been filled in…

Concrete Pad

South Aisle with David casting an eye over the Nave

Timecapsule going under the floor in the South Aisle

Through the arches

The rain holds off to enable some of the work to be done oustide